History will be made on 1 June at the University Heart and Vascular Centre of the UKE Hamburg.

With up to 379 beds across 15 wards, 9 operating theatres and 10 cardiac catheterisation laboratories, as well as a sterile reprocessing facility with a capacity of 90,000 units per year, a forward-looking new hospital building (‘UKE’) was constructed to provide state-of-the-art care.
The challenge here was the coronavirus pandemic during the construction phase. Translated with DeepL.com (free version)

We at Lischka GmbH are very proud to supply our innovative products for the

  • unhygienic work areas with GEYSIR series bedpan washers GEYSIR
  • the unclean and clean sides of the AEMP with our products ProShield, ProPack and ProSort
  • cardiac catheterisation laboratories equipped with specialised storage cabinets featuring a pass-through system from the ProLine range

to have been hired.